Step 1
REACH OUT TO YOUR LOCAL PLANNING DEPARTMENT
Request a Thumbs Up to build an Engineered Steel Building (Home, Cabin, Shop, etc.) of the required size and height on your property
While speaking to them, also request the following information:
1. The roof or ground snow load requirements (both if required)
2. The frost depth for the foundation
3. The wind speed requirements
Step 2
REQUEST A FREE DESIGN CONSULT ON OUR HOME PAGE
STEP 3
STEP 3 IS FOR RESIDENTIAL BUILDINGS ONLY
If you feel that you would like to sit down with your planning department prior to ordering engineered plans from us,
then Step 3 will provide you with Preliminary Documents to do that.
STEP 3 OPTIONS
Option 1-Residential Buildings-FLOOR PLANS REQUIRED
You would Order the Preliminary Plan Review Packet ($597) here:Preliminary Plan Review Packet
Option 2-Residential Buildings-FULL ARCHITECTURAL PLANS
Please Click Here for a Detailed Breakdown of What is Included in Every Architectural Plan Set
STEP 4
ORDER ENGINEERED PLANS
If your steel building is not intended for residential use, you probably won’t need the Architectural Plan Set.
If you are constructing a residential steel building and have not yet purchased the Architectural Plan Set, this is the time to do so.
We collaborate closely with the Architect to complete the full design of your residential steel building and make necessary adjustments to the placement of windows and doors. This ensures that your building is engineered smoothly and without any issues.
Additionally, now is the time to order the Engineered Plans for your Steel Building Kit.
Engineered Plans require a 20%(+tax) deposit.
Once the deposit is received, and we have received the final set of Architectural Plans from our Off-Shore Architect, our Engineering Team will go to work creating your stamped and signed set of plans, for both your Steel Building Kit and your Foundation.
You can anticipate receiving your digitally stamped and signed plans within five to seven business days.
Additionally, our engineers will send you hard copies of the signed plans by mail.
Our Engineers Are Approved in ALL 50 States
STEP 5
Once you have obtained your Engineered Building Plans, and Architectural Plans, it's time to submit these documents to your
Planning Department and Building Team.
STEP 6
Once You Have Received Your Permit from Your Planning Department, You Are Ready to Order the Steel Eco-Kit.
We will then calculate the current price for the building, allowing you to lock in the price of the Steel Building Kit by paying the remaining balance.
and You Should Receive It Within 4-8 Weeks!!!